Tooting Primary School

  • Search this websiteSearch Site
  • Translate the contents of this page Translate Page
  • X X
  • ParentPay ParentPay

Facilities

Our newly refurbished school provides superb facilities for teaching and learning.

The school is split over three floors and is designed to cater for 63 children in each year group. The school is two-form entry with a resource base for children with ASC.

Each classroom throughout the school has a 65" HD interactive screen and wireless technology, enabling children to develop and learn ICT skills in a purposeful way.

On the ground and first floor we have large halls used for dining, assemblies, PE and performances.

We have three outdoor play areas, including a large main playground with two structures to extend space for children’s physical and creative play, as well as a multi-use games pitch. There is a dedicated EYFS playground with safe climbing structures and a “mud kitchen”, and a smaller playground with climbing equipment to enable children from the base to access outdoor play in a quieter environment.

In addition to on-site provision, we have access to facilities at Graveney School, where children can use specialist areas to enhance the curriculum. We also have a newly built kitchen that provides nutritious, freshly prepared food every day.

↑